Joel Hendry - Projects - Repair Work
< Back | Home | Links | Contact  
Brockhampton Court

Description:
Repairs were carried out to the front of this building, reinserting the mid section of the coving run {believed to be one of the longest in the country}. Other patch and structural repairs were carried out, resin was used in a lot of the repairs. Shaping the mouldings was all done by hand and each coving bracket was individually curved from a suitably bent piece of wood.
Involvements:
Timber repairs
Building Works:
The Oak Frame Carpentry Co
Location:
Gloucestshire
Date:
1999
Materials Sourced:
Oak

Brockhampton Court
Brockhampton Court
Brockhampton Court

< Back | Home | Links | Contact